Bathroom remodeling across Plano, Frisco, Allen and Richardson

Bathroom RemodelPlano Design visit

S/02Walk-in showers

Walk-in shower remodel in Plano, TX, built dry from the slab up

A walk-in shower is the single most requested change in Plano bathrooms. We remodel and install walk-in showers of every size, from a roomier curbed shower in a hall bath to a curbless primary shower with a bench, a long niche and floor-to-ceiling glass, and we build each one on a tested waterproof system.

Free design consultation

Plan my new bathroom

Choose the project, the timing and your ZIP, then leave a number. We reply, usually within one business day, to set up a design visit.

When you click ‘Show me my options,’ you are agreeing that Bathroom Remodel Plano and one local bathroom remodeler may reach you by phone call or text at the number entered above about your bathroom project. Any of those calls or texts may involve artificial intelligence (AI), autodialing technology, or artificial and prerecorded voices. Agreeing is not a condition of purchase. Text STOP to opt out or HELP for help. Message frequency varies by project, and your carrier’s message and data rates may apply. Details are in our Privacy Policy and Terms.

Walk-in shower in Plano example: curbless shower with large-format porcelain tile running in from the bathroom floor and a glass panel

A walk-in shower simply means one you enter without stepping over a tub wall. Beyond that, the options range widely: how big it is, whether it has a curb, what kind of glass encloses it, where the drain sits and what goes on the walls. Most of the shower remodels we do in Plano replace a small fiberglass stall, a tub-shower combination or a garden tub with something larger and easier to live with.

Three kinds of walk-in shower

Curbed. A low wall, usually 4 to 6 inches tall, holds water in the shower. It is the simplest to build on a slab because the shower floor can sit at the same level as the bathroom floor, sloping to a center drain inside the curb.

Low-curb. A curb of an inch or two, often with a sloped profile, gives most of the open look of a curbless shower at lower cost. It suits many Plano hall baths and primary suites where the budget matters.

Curbless (zero-entry). The bathroom floor flows into the shower without any step. On a slab, that means recessing the shower area into the concrete so the floor can slope to a linear drain while staying flush at the entry. It is the most elegant and the most accessible option, and it takes the most planning.

Walk-in shower with warm wood-tone walls, a glass panel and a built-in bench
A bench and a handheld shower make a walk-in shower useful for shaving legs, rinsing children and aging in place.

How we build a shower that stays dry

The tile is not what keeps water out of your walls; the system behind it is. Every walk-in shower we build follows the same sequence:

  1. Demolition to the studs and slab. Old tile, backer board, any mortar bed and the old pan come out so we can see the framing and the concrete.
  2. Framing and blocking. We straighten walls, frame niches and benches, and add solid blocking for grab bars and glass hardware before anything is covered.
  3. Drain and pan. The drain is set where the layout calls for it, and the floor is sloped evenly to it, typically a quarter inch per foot.
  4. Bonded waterproofing. A continuous waterproof membrane covers the floor, the curb and the walls, with sealed seams, corners and pipe penetrations.
  5. Flood test. We plug the drain and fill the shower floor with water, then check that the level has not dropped before any tile goes in.
  6. Tile, grout and sealant. Tile is set over the membrane, with soft joints where walls meet and where the shower meets the floor.
  7. Glass. Frameless glass is measured after tile so it fits the finished surfaces exactly.

Features worth planning in

  • A bench, built-in or floating, for shaving, sitting and later in life.
  • A niche long enough for real bottles, placed out of the direct spray and away from where the glass will be seen.
  • A handheld on a slide bar in addition to the fixed head, with its own valve or diverter.
  • A linear drain, which lets the floor slope in one direction and works with large tiles.
  • Light inside the shower, with a fixture rated for wet locations.
  • A taller enclosure, sometimes to the ceiling with a small transom for steam, depending on ventilation.

Hard water and walk-in showers

North Texas water leaves white spots on glass, chrome and dark tile. We suggest glass with a factory protective coating, matte or brushed fixture finishes that hide spots, lighter grout colors and a squeegee habit. A water softener helps more than any finish does if hard water bothers you throughout the house.

What a walk-in shower costs in Plano

A walk-in shower remodel in an existing footprint commonly runs from the low teens to the low twenties in Plano, depending on size, tile and glass. Curbless showers, relocated drains, large-format or stone tile and full-height glass push costs higher. HomeAdvisor's Plano bathroom data averages $10,468, and This Old House reports full remodels averaging $17,794 to $33,809 locally; a shower-only project usually sits between those. Try the estimator with the curbless and glass options switched on to see the difference.

Walk-in shower permits in Plano

Replacing a shower in the same location with the drain where it is typically does not require a permit. Moving the drain, changing walls or adding circuits does. We pull any permit needed and coordinate the plumbing and electrical inspections. See Plano bathroom remodel permits.

An example walk-in shower in a Plano hall bath

As an illustration, consider a 1988 Plano single-story with a hall tub-shower that the owners want to replace with a walk-in shower, since the primary bath has a tub. The tub comes out, and a 60-by-34-inch shower goes in with a low curb, a niche, a corner shelf, a pressure-balancing valve and a handheld on a slide bar. Porcelain in a matte finish covers the walls, and a small hex mosaic covers the floor for grip. A frameless door and fixed panel close the opening. Expect about 17 working days at the house, with glass following.

Shower controls and layout

Where the controls sit matters. Placing the valve near the entrance lets you turn on the water and wait for it to warm up without getting wet. A handheld on a slide bar adjusts for different heights and helps with cleaning. If you want multiple outlets, like a rain head plus a handheld, a thermostatic valve with volume controls lets you run them together or separately.

Lighting a walk-in shower

A wet-rated recessed light inside the shower makes a big difference, especially in larger showers with solid glass panels or half walls. Lit niches add a soft glow. We plan the lights during rough-in, so wiring is in place before tile.

Shower floor tile options

Shower floors need grip and the ability to follow the slope to the drain. Small mosaics, such as 2-inch hex or penny tile, work well with center drains. Bigger tiles pair best with a linear drain and a floor pitched one way. Matte and textured finishes improve traction.

Choosing a walk-in shower drain

Center drains are standard and cost less. Linear drains allow larger floor tiles, curbless entries and a more modern look. Tile-in drains hide the drain under a strip of the same tile for a seamless finish.

Walk-in showers for every Plano home

Whether your house is a 1970s ranch in east Plano or a 2000s two-story near Legacy, a walk-in shower can usually fit. In compact rooms, it replaces a tub. In large suites, it absorbs the garden tub space. We design the shower around your space, your routine and your budget.

Shower installation and shower replacement in Plano

A new shower installation in a Plano home usually happens one of three ways: replacing a failed shower in the same footprint, converting a tub alcove, or building a larger shower where a garden tub once sat. A straight shower replacement is often the quickest, since the drain and valve may stay where they are, but we still rebuild the pan and waterproofing from scratch rather than tiling over old layers. That is how a replacement shower lasts as long as a brand-new one.

FAQ

Walk-in showers questions from Plano homeowners

Short answers for this page. Our full Plano bathroom remodeling FAQ covers nearly a hundred more.

How big should a walk-in shower be?

Forty-eight by thirty-six inches is a comfortable minimum for one person. In Plano primary baths where a garden tub comes out, sixty by forty-two or larger is common and leaves room for a bench and two people.

Do walk-in showers need a door?

Not always. A doorless shower needs enough depth and a fixed glass panel placed so the spray stays inside. Most clients choose a fixed panel or a hinged frameless door, which we cover on our frameless glass page.

Can you build a curbless shower on a slab foundation?

Yes. We recess the shower area into the slab letting the shower floor pitch toward its drain while staying level with the bathroom. If the slab is post-tensioned, we locate the tendons first and plan the cut around them.

How long does a walk-in shower remodel take?

Usually one to two weeks on site for the shower itself, plus one to two weeks for custom glass to be fabricated after tile. Full bathroom projects take longer.

Will a walk-in shower hurt resale in Plano?

Rarely, as long as the home keeps a tub in at least one other bathroom. Walk-in showers in primary suites are one of the features Plano buyers look for.

Is a steam shower possible?

Yes, with a sealed enclosure, a vapor-proof membrane, a sloped ceiling and a steam generator. It adds cost and an electrical circuit, and we plan it from the start rather than adding it later.

Where should the shower valve go?

Near the entry, so you can reach it without stepping into the spray. We plan the valve location during design.

Does a walk-in shower need a light?

Larger showers benefit from a wet-rated recessed light, especially when glass or half walls block light from the room.

Which shower drain is easiest to clean?

Linear drains with a removable cover and hair trap are easy to clean, and tile-in drains are nearly invisible.

Can a walk-in shower have a window?

Yes, with a moisture-resistant window, a sloped sill and careful waterproofing.

Can I get a walk-in shower in a small Plano hall bath?

Yes, in place of the tub, if another bathroom in the home keeps a tub.

Get started

Plan your Plano bathroom remodel

Tell us which bathroom and what bothers you about it. We set up a visit, measure the room, sketch a layout and send an itemized written price. Nothing is ordered until you approve.

  • The design visit is free
  • Demolition, waterproofing, tile, glass, fixtures and any city permit listed one by one
  • Rather talk now? (972) 707-1895

Project request

Takes a minute

When you click ‘Send my request,’ you are agreeing that Bathroom Remodel Plano and one local bathroom remodeler may reach you by phone call or text at the number entered above about your bathroom project. Any of those calls or texts may involve artificial intelligence (AI), autodialing technology, or artificial and prerecorded voices. Agreeing is not a condition of purchase. Text STOP to opt out or HELP for help. Message frequency varies by project, and your carrier’s message and data rates may apply. Details are in our Privacy Policy and Terms.

CallDesign visit